Mercado Node 3 - Completed Relay 3 - Side View
Posted March 4th, 2005 by mikemee
Side view of the completed relay node. Note the water proofing of the connectors using electricians putty, aka "duck goop". We've replaced two cables elsewhere in our network in this unexpected San Diego rainy winter and don't want to do any more!
Note that the antenna holes on this box are less than ideal. Its designed for two small omnis screwed directly to the box. Ideally we'd have two holes on the bottom along with the cat-5 cable hole.
Side view of the completed relay node. Note the water proofing of the connectors using electricians putty, aka "duck goop". We've replaced two cables elsewhere in our network in this unexpected San Diego rainy winter and don't want to do any more!
Note that the antenna holes on this box are less than ideal. Its designed for two small omnis screwed directly to the box. Ideally we'd have two holes on the bottom along with the cat-5 cable hole.
So Cal Free Net.org
Comments
Post new comment