Bolting Upright to Base
Posted July 9th, 2006 by Matt Fanady
Due to the overall size of this mast, it was necessary to construct it in two parts. The upright and the base. Once the two sections were hauled up four flights of stairs to the roof (along with 4 heavy cinder blocks)they were bolted together with four outer and four inner bolts.
in
Due to the overall size of this mast, it was necessary to construct it in two parts. The upright and the base. Once the two sections were hauled up four flights of stairs to the roof (along with 4 heavy cinder blocks)they were bolted together with four outer and four inner bolts.
So Cal Free Net.org
Comments
Post new comment